1
|
PIAC-AGA-CONSAVIZ (Eng)
«Issuance of permits for constructions, facilities and equipment siting in aeronautical servitudes areas»
|
Procedures for providing approval on the coordination of construction and disposal for objects in the civil aerodrome areas of the Republic of Moldova
|
November
2019
|
Edition 01/ November
2019
|
|
|
|
2
|
PIAC-AGA-AVCONS
«Eliberarea avizelor privind construcţia/reconstrucţia aerodromurilor/aeroporturilor/heliporturilor şi a obiectelor speciale»
|
The procedure for the issuance of CAA approvals for construction of new and modernization of existing airdromes / airports
|
Iune 2020
|
Ed. 01
17.06.2020
|
|
|
|
3
|
PIAC-AD Part 1
|
Certification of civil airdromes according to Regulation regarding administrative procedures related to aerodromes. Preparation of the airdrome operator for conversion of the airdrome/airport operator certificate
|
June 2019
|
Edition 01
21.06.2019
|
|
|
|
4
|
PIAC-AD Part 2
|
Certification of civil airdromes according to Regulation regarding administrative procedures related to aerodromes. Conversion of the airdrome/airport operator certificate.
|
June 2019
|
Edition 01
21.06.2019
|
|
|
|
5
|
PIAC-AP
|
Issuance of approval (permissive) documents of the Civil Aviation Authority
|
June 2020
|
Edition 01
01.06.2020
|
|
|
|
6
|
GM-AER-WILDLIFE
«Reducerea riscului de impact al aeronavelor cu păsările și animalele sălbatice»
|
The guidance material "Reducing the risk of aircraft impact with birds and wildlife"
|
Мai
2020
|
Edition 01/
Мai 2020
|
|
|
|
7
|
MI.DAP.DATA.BIRDSTRIKE
«Sistemul de furnizare а datelor, colectare şi analiză rapoartelor privind coliziuni cu păsăril»
|
The guidance material " Reporting System of data collection and analysis of reports about collisions with animals and direction of corresponding data to the information system of the ICAO bird strike"
|
May
2016
|
Edition 02/ April 2016
Revision 01/
February 2021
|
|
|
|
8
|
MI.DAP.RISK.MANAGEMENT
«Managementul riscurilor de siguranta»
|
The guidance material "Risk management in the field of safety"
|
May
2016
|
Edition 02/ April 2016
|
|
|
|
9
|
AMC-BP ADR
|
Structure of the business plan for airdrome/airport operators
|
August
2019
|
Edition 01/ August 2019
|
|
|
|
10
|
Guidance material supplementary to CT-AD, Attachment 1
|
Number, siting and orientation of runways
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
11
|
Guidance material supplementary to CT-AD, Attachment 2
|
Clearways and stopways)
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
12
|
Guidance material supplementary to CT-AD, Attachment 3
|
Calculation of declared distances
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
13
|
Guidance material supplementary to CT-AD, Attachment 4
|
Slopes on a runway
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
14
|
Guidance material supplementary to CT-AD, Attachment 5
|
Runway surface evenness
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
15
|
Guidance material supplementary to CT-AD, Attachment 6
|
Assessing the surface friction characteristics of snow-, slush-, ice- and frost-covered
paved surfaces [Applicable until 3 November 2021] [Order № 42/GEN from 21.10.2020].
Runway condition report for reporting runway surface condition [Applicable 5 November 2021] [Order № 42/GEN from 21.10.2020].
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
16
|
Guidance material supplementary to CT-AD, Attachment 7
|
Determination of surface friction characteristics for construction
and maintenance purposes [Applicable until 3 November 2021] [Order № 42/GEN from 21.10.202]
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
17
|
Guidance material supplementary to CT-AD, Attachment 8
|
Strips
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
18
|
Guidance material supplementary to CT-AD, Attachment 9
|
Runway end safety areas
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
19
|
Guidance material supplementary to CT-AD, Attachment 10
|
Location of threshold
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
20
|
Guidance material supplementary to CT-AD, Attachment 11
|
Approach lighting system
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
21
|
Guidance material supplementary to CT-AD, Attachment 12
|
Priority of installation of visual approach slope indicator systems
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
22
|
Guidance material supplementary to CT-AD, Attachment 13
|
Lighting of unserviceable areas
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
23
|
Guidance material supplementary to CT-AD, Attachment 14
|
Rapid exit taxiway indicator lights
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
24
|
Guidance material supplementary to CT-AD, Attachment 15
|
Intensity control of approach and runway lights
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
25
|
Guidance material supplementary to CT-AD, Attachment 16
|
Signal area
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
26
|
Guidance material supplementary to CT-AD, Attachment 17
|
Rescue and firefighting services
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
27
|
Guidance material supplementary to CT-AD, Attachment 18
|
Operators of vehicles
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
28
|
Guidance material supplementary to CT-AD, Attachment 19
|
The ACN-PCN method of reporting pavement strength - [Applicable until 27 November 2024]
[Order № 42/GEN from 21.10.2020]
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
29
|
Guidance material supplementary to CT-AD, Attachment 22
|
Autonomous runway incursion warning system (ARIWS)
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
30
|
Guidance material supplementary to CT-AD, Attachment 23
|
Taxiway design guidance for minimizing the potential for runway incursions
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
31
|
Guidance material supplementary to CT-AD, Attachment 24
|
Aerodrome mapping data
|
October
2019
|
Edition 01/ August 2019
|
|
|
|
32 |
SNOWPLAN in force (TILL 03-NOV-2021 – see AIP AD 1.2.2
|
Procedures relating to monitoring and reporting of information on the condition of the movement area and related facilities
|
March 2017 & April 2019 (AMDT 001/2019) |
March 2017 & April 2019 (AMDT 001/2019) |
|
|
|
33 |
NEW SNOWPLAN (FROM 04-NOV-2021) - RAW DATA signed
|
Procedures relating to monitoring and reporting of information on the condition of the movement area and related facilities
|
November 2021 |
November 2021 |
|
|
|
34 |
GM-AER-CAO.GRF |
Guidance material on the use of the Global Reporting Format and runway condition code |
April
2021 |
Edition 01/ April
2021 |
|
|
|